Introducing a product supply tradition at Etsy


Etsy, an internet market for distinctive, handmade, and classic gadgets, has
seen excessive development during the last 5 years. Then the pandemic dramatically
modified consumers’ habits, resulting in extra shoppers procuring on-line. As a
outcome, the Etsy market grew from 45.7 million patrons on the finish of
2019 to 90.1 million patrons (97%) on the finish of 2021 and from 2.5 to five.3
million (112%) sellers in the identical interval.

The expansion massively elevated demand on the technical platform, scaling
visitors virtually 3X in a single day. And Etsy had signifcantly extra clients for
whom it wanted to proceed delivering nice experiences. To maintain up with
that demand, they needed to scale up infrastructure, product supply, and
expertise drastically. Whereas the expansion challenged groups, the enterprise was by no means
bottlenecked. Etsy’s groups have been capable of ship new and improved
performance, and {the marketplace} continued to supply a wonderful buyer
expertise. This text and the following kind the story of Etsy’s scaling technique.

Etsy’s foundational scaling work had began lengthy earlier than the pandemic. In
2017, Mike Fisher joined as CTO. Josh Silverman had not too long ago joined as Etsy’s
CEO, and was establishing institutional self-discipline to usher in a interval of
development. Mike has a background in scaling high-growth corporations, and alongside
with Martin Abbott wrote a number of books on the subject, together with The Artwork of Scalability
and Scalability Guidelines.

Etsy relied on bodily {hardware} in two knowledge facilities, presenting a number of
scaling challenges. With their anticipated development, it was obvious that the
prices would ramp up shortly. It affected product groups’ agility as that they had
to plan far prematurely for capability. As well as, the info facilities have been
primarily based in a single state, which represented an availability danger. It was clear
they wanted to maneuver onto the cloud shortly. After an evaluation, Mike and
his staff selected the Google Cloud Platform (GCP) because the cloud companion and
began to plan a program to maneuver their
many methods onto the cloud
.

Whereas the cloud migration was taking place, Etsy was rising its enterprise and
its staff. Mike recognized the product supply course of as being one other
potential scaling bottleneck. The autonomy afforded to product groups had
brought about a problem: every staff was delivering in numerous methods. Becoming a member of a staff
meant studying a brand new set of practices, which was problematic as Etsy was
hiring many new folks. As well as, that they had observed a number of product
initiatives that didn’t repay as anticipated. These indicators led management
to re-evaluate the effectiveness of their product planning and supply
processes.

Choosing a companion

Etsy had by no means labored with a software program growth consultancy. To have the opportunity
to scale product supply and herald some outdoors experience, they began
in search of a vendor. After an in depth search, they chose Thoughtworks,
primarily as a result of they perceived a detailed cultural match and deep alignment
concerning trendy software program growth.

Thoughtworks has an analogous strategy to Agile as Etsy – being Agile
relatively than doing Agile. Etsy’s staff was not trying to undertake a
methodology that blindly follows strict rituals and practices, and needed
a companion that bases its strategy on agile ideas and tradition.
Thoughtworks is thought for technical excellence and management in DevOps,
Steady Integration, and Steady Supply, all of which Etsy depends
on closely. As well as, the 2 corporations shared related ideas
concerning worker care, variety, open-source, and expertise
sustainability.

The Thoughtworks staff began by embedding into product groups, working with
each purchaser and vendor groups, on numerous vital initiatives comparable to fee
mannequin modifications, Search Engine Optimization (search engine marketing), and a notification platform.
This enabled Thoughtworks to grasp how Etsy labored, created a direct
impression on supply, and improved growth practices comparable to automated
testing.

For Thoughtworks, Etsy was fairly completely different from the standard consumer.
They’re a totally digital firm, and their technical course of and product
practises are very mature. Not like most shoppers who have interaction Thoughtworks,
Etsy had no massive transformation to undertake, and no ingrained habits
that wanted a significant shift. What they have been searching for was outdoors perspective
and supplementive expertise, to assist them incrementally enhance and sort out
their urgent initiatives. The tradition and ideas have been already very
aligned with Thoughtworks’ personal, so the partnership grew to become extra of an
trade of concepts drawn from completely different experiences.

Scaling Product Supply and Discovery

Thoughtworks and Etsy shaped a cross-functional Product Supply
Tradition (PDC) staff to research the present product supply and discovery
course of. They analyzed the complete software program growth worth stream,
wanting carefully on the complaints of managers and staff members. Chosen
occasions have been replayed to realize a deep understanding of “how” it occurred
relatively than who?. The Thoughtworks
staff, as a result of they hadn’t lived by means of the issues, have been capable of carry
an goal outsider perspective.

There have been quite a lot of issues Etsy was doing very well:

  • Cross-functional groups: They structured their groups round “4 desk legs”:
    Product, Design, Engineering, and Analytics. All planning and supply practices
    occur with collaboration among the many teams.
  • Incremental supply of worth to customers: Steady supply is the core
    follow of their strategy. A code change sitting in a repository and never
    deployed to customers is just not worthwhile, and successfully prices the corporate cash. Etsy
    deploys lots of of instances a day, with a 30-minute decide to manufacturing lead
    time.
  • Options are prioritized utilizing knowledge: Product managers and knowledge analysts
    collaborate to find out an anticipated worth, measured by KPI modifications. If the
    characteristic doesn’t ship sufficient worth versus its value, as evidenced by an A/B
    check, it’s not rolled out, and the code is eliminated.

The staff additionally uncovered alternatives for enchancment:

  • Every staff was doing supply in numerous methods, having disparate processes
    and rituals, making onboarding new workers and altering groups troublesome. Some
    groups have been utilizing a course of like Scrum, whereas others didn’t use any formal
    course of.
  • There have been quite a lot of initiatives that had not created worth as
    they anticipated. For instance, Etsy tried a present wrap characteristic that had
    decrease than anticipated adoption charges by sellers and patrons.
  • Previous to 2018, Etsy had been by means of a transitional interval, with
    pivots in product technique and management modifications main some product
    managers to expres a need for better possession over their product
    choices.

Time to studying

The staff created an enchancment program, primarily based on lean considering and the
concepts of Marty Cagan, who had not too long ago introduced at Etsy. The management staff was
studying his guide Impressed.

I promise you that not less than half the concepts
in your roadmap should not going to ship what you hope. (By the way in which, the
actually good groups assume that not less than three quarters of the concepts received’t
carry out like they hope.)

Marty Cagan, Impressed (p19)

After some preliminary analysis the staff got here up with a metric they known as Time
to Studying – the time it took for a product staff to validate an concept with a
buyer and acquire a greater understanding of its worth. They’d a baseline of
50 days that they needed to scale back.

They have been additionally taking a look at different metrics.

  • Bettering the time to market
  • Bettering the effectiveness of merchandise (e.g. income, buyer
    engagement)
  • Worker happiness

To impression the KPIs, they got here up with quite a lot of resolution hypotheses:

Lightweight prototypes that incorporate extra direct person analysis

Etsy has sturdy experimentation infrastructure and analytics capabilities.
They run many concurrent A/B assessments on {the marketplace}. The issue the PDC
staff noticed is that the suggestions cycle may be fairly sluggish. For an concept to be
prepared for an A/B check it needed to be close to production-level high quality. It additionally had
to have sufficient knowledge to point out statistical relevance. A/B assessments would run for
months in lesser-used components of {the marketplace}.

To set your expectations, sturdy groups usually
check many product concepts every week—on the order of 10 to twenty or extra per week. I
wish to emphasize that these are experiments, usually run utilizing prototypes.
A prototype is just not one thing that’s prepared for prime time and positively not
one thing your organization would attempt to promote and stand behind. However they’re
immensely helpful, as they’re all about studying quick and low-cost.

Marty Cagan, Impressed (p27)

To cut back the Time to Studying metric, the PDC staff utilized a lean UX
strategy. First, they began by shortly creating lo-fi prototypes and
instantly displaying them to customers. Second, the staff elevated person suggestions
classes to each two weeks and diminished the extent of ceremony. Third, they
created a dual-track system, with a design and analysis staff regularly
working forward of a supply staff. The concept was to effectively acquire confidence
in an concept earlier than it qualifies for an A/B check. By decreasing the price of
experimentation, they may enhance the variability and amount of experiments,
discovering concepts that confirmed extra worth.

Determine 1: Experiment validation course of

Blueprint for product supply

The PDC, along side product staff leaders, got here up with a set of
product supply ideas and associated supply follow modifications. The
practices included: smaller extra centered tales, redesigning story partitions to
higher match the staff course of, utilizing spikes to scale back technical uncertainty, and
higher methods of managing tech debt. They didn’t wish to take away the autonomy of
groups. Steady enchancment is a giant a part of Etsy tradition. These practices
are supposed to be handled as smart defaults that may be tailored and improved
for every staff’s particular context.

The PDC staff first examined the follow modifications on pilot product groups to
set up their effectiveness after which iterated. As soon as the follow
demonstrated an enchancment, the staff added to a information base and supplied
gentle teaching to introduce the brand new practices to all product groups throughout
Etsy.

Lean Portfolio administration

Some massive initiatives have been nonetheless being carried out, though there was
not clear proof of the initiative creating worth. That is the standard sunk
value drawback. To resolve this, the PDC staff
prompt taking a lean strategy to portfolio administration.

Our runway needs to be a listing of hypotheses to check, not a listing of
necessities to construct. After we reward our groups for his or her means to ship
necessities, it’s straightforward to quickly bloat our merchandise with pointless
options—resulting in elevated complexity, greater upkeep prices, and
restricted means to vary. Options delivered should not a measure of success,
enterprise outcomes are. Our runway is a collection of questions that we have to
check to scale back uncertainty and enhance our understanding of development
alternatives.

Humble et al, Lean Enterprise (p96)

As an alternative of making prolonged undertaking specs and plans, the PDC staff
coached product groups to develop final result statements for every initiative. With
final result statements, beginning with a buyer or enterprise final result permits the
staff to experiment with many various concepts to attain the end result by tying
them to measurable KPIs. The much less exact an final result is, together with its KPIs,
the tougher it’s to specify. When getting ready for potential initiatives, every
product staff created a two-page transient summarizing the end result, the measurable
impression, and the preliminary funding required.

The chief staff prioritized the end result statements, and every assertion
was seen as a “wager” amongst a portfolio. Impressed by the Lean Worth Tree
idea, the chief staff would follow an everyday cadence to find out if a
wager was paying off, giving them the chance to pivot early.

Determine 2: An instance initiative assertion

Stronger product & engineering collaboration

One other enchancment was to incorporate engineers early within the product ideation
course of and to have them be part of person suggestions classes. The staff examined
engineers becoming a member of the speculation era and validation classes and
working carefully with designers throughout design sprints. The outcomes of the check
confirmed a number of advantages. Engineers improved their understanding of the
buyer, constructing empathy for his or her wants. They may present on-the-spot
suggestions on the feasibility of an strategy and shortly create prototypes to
reveal concepts to customers. Cross-functional engagement allowed engineers to
contribute quite a lot of nice concepts that made it to the product.

After the preliminary PDC initiative Etsy continued to strengthen the
collaboration between teams. At each degree of the group, product and
engineering are companions, which suggests they’re capable of have wholesome trade-off
discussions. The platform group expanded using product managers for
infrastructure and developer tooling groups – encouraging groups to consider
technical capabilities as merchandise and end-users being Etsy engineers. The
technical product managers do analysis and prioritization actions, simply as
they might for a buyer product.

What was the impression of product supply tradition?

Testing with pilot groups indicated that the Time to Studying went from 50
days to five days. Throughout the pilot, one product supervisor stated, “What I like about
the [direct user research sessions] pilot is that it lets us check our concepts
quicker, it was very nice to not spend as a lot time diving deep into
one thing that we didn’t even know we have been going to make use of.” An initiative on
stock high quality that was predicted to ship a seven million greenback income
enhance as an alternative delivered eleven million {dollars} in incremental worth utilizing
the PDC prompt enhancements. Following this pilot success, the staff coached
the complete product growth group on the product supply strategy.

In keeping with Mike Fisher, “It is vitally arduous to isolate the advantages of a
course of change on a company of a number of hundred engineers since we don’t
run A/B experiments of this sort. Nevertheless, we did take a look at excessive degree
productiveness metrics after having PDC carried out for over 2 years, and all of
our metrics have been very optimistic. We had improved our velocity by doing this
work, and we have been capable of produce finally extra advantages for the patrons and
sellers – extra options, higher search, higher processes; the entire
market grew to become higher for patrons and sellers and that was the objective.”